 |
In MAISITE test, if the insulation panels is installed between the mold-forming machines and , molds need 105 minutes to Warming to the temperature of 160 C, but after the installation of insulation panels, 46-minute set to rise temperature, save time by about 60% than not to installation, and savings maintain constant temperature 0.8kwh state's power consumption per hours , cut about 40% than not installation. |